Skip to product information
1 of 9

Generic

Heavy-Duty Telescopic Boom Forklift – 1–3 Ton Telehandler for Industrial Material Handling & Jobsite Logistics

Heavy-Duty Telescopic Boom Forklift – 1–3 Ton Telehandler for Industrial Material Handling & Jobsite Logistics

Regular price $34,746.00 USD
Regular price Sale price $34,746.00 USD
Sale Sold out
View on Amazon

Brand: Generic

Color: Customized

Features:

  • Please Note: This forklift is available in multiple models; the price is for reference only. For detailed product specifications and operating videos, please contact the manufacturer via Whatsapp+86 138 37I6 2651 before purchasing.
  • This telescopic forklift telehandler combines lifting, loading, and handling in one machine, offering an extendable boom for versatile construction and farm operations.
  • Designed for demanding jobsites, the telehandler with telescopic boom easily handles pallet lifting, material loading, and high-reach placement with strong stability.
  • Built for durability, this industrial telehandler forklift withstands heavy loads while maintaining precise control during lifting and stacking tasks.
  • Combining mobility and strength, the telehandler with telescopic arm is one of the most efficient machines for modern construction projects.

model number: NAT-SSBCC2-6

Package Dimensions: 91.0 x 90.0 x 86.0 inches

Materials

Shipping & Returns

Dimensions

Care Instructions

View full details

Image with text

Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.

  • Free Shipping

    Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.

  • Hassle-Free Exchanges

    Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.