Skip to product information
1 of 10

Generic

Heavy-Duty Telescopic Boom Forklift, Rough Terrain Forklift – 1–3 Ton Telehandler for Industrial Material Handling & Jobsite Logistics

Heavy-Duty Telescopic Boom Forklift, Rough Terrain Forklift – 1–3 Ton Telehandler for Industrial Material Handling & Jobsite Logistics

Regular price $41,599.00 USD
Regular price Sale price $41,599.00 USD
Sale Sold out
View on Amazon

Brand: Generic

Color: Customized

Features:

  • Special reminder – This forklift is available in multiple models, The prices listed are not final. For more details customization inquiries, please contact the manufacturer via Whatsapp+86 13837162651 before purchasing.
  • With quick-attach tools, this telescopic forklift telehandler can lift pallets, move bulk materials, or assist with hoisting operations.
  • A versatile telescopic loader telehandler supports material unloading, short-range transport, and site leveling with a front bucket attachment.
  • Built for durability, this industrial telehandler forklift withstands heavy loads while maintaining precise control during lifting and stacking tasks.
  • This rough terrain telescopic forklift adapts easily to tight or complex sites where traditional forklifts cannot operate efficiently.

model number: HJW-DD8CC-04

Package Dimensions: 180.0 x 80.0 x 80.0 inches

Materials

Shipping & Returns

Dimensions

Care Instructions

View full details

Image with text

Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.

  • Free Shipping

    Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.

  • Hassle-Free Exchanges

    Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.