Generic
Heavy-Duty Telescopic Boom Forklift, Rough Terrain Forklift – 1–3 Ton Telehandler for Industrial Material Handling & Jobsite Logistics
Heavy-Duty Telescopic Boom Forklift, Rough Terrain Forklift – 1–3 Ton Telehandler for Industrial Material Handling & Jobsite Logistics
Regular price
$42,299.00 USD
Regular price
Sale price
$42,299.00 USD
Unit price
per
Couldn't load pickup availability
Brand: Generic
Color: Customized
Features:
- Please Note – This forklift is available in multiple models, The prices listed are not final. For more details customization inquiries, please contact the manufacturer via Whatsapp+86 13837162651 before purchasing.
- With quick-attach tools, this telescopic forklift telehandler can lift pallets, move bulk materials, or assist with hoisting operations.
- A versatile telescopic loader telehandler supports material unloading, short-range transport, and site leveling with a front bucket attachment.
- Built for durability, this industrial telehandler forklift withstands heavy loads while maintaining precise control during lifting and stacking tasks.
- A powerful telescopic boom loader enables high-reach lifting and ground-level loading, reducing the need for multiple machines on site.
model number: TJH-SSBC-3
Package Dimensions: 180.0 x 80.0 x 80.0 inches
Materials
Materials
Shipping & Returns
Shipping & Returns
Dimensions
Dimensions
Care Instructions
Care Instructions

Image with text
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.
-
Free Shipping
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.
-
Hassle-Free Exchanges
Pair text with an image to focus on your chosen product, collection, or blog post. Add details on availability, style, or even provide a review.